IS WORK OVER?

Automation index

How much of a Wastewater-plant operator’s job can AI already do?

A flow comes earlier. Coming out clean without losing the sludge do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wastewater-plant operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, process and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Basin, the sludge and the one that goes.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Breakdown, the pump and at night.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Test, the discharge and not hiding the spike.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The rain, the overflow and not opening extra.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come out clean, and the sludge in place.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • works flow
  • sludge
  • basins
  • pumps
  • discharges
  • overflows
  • plant logs
  • final tests

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Virologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
PCR, cultures and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Isolate, biosafety and the one that breaks.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Outbreak, sequence and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Public health, the note and not delaying.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The clinician, the antiviral and not jumping.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Isolate, and not contaminating.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • virus PCR
  • cultures
  • biosafety
  • sequence outbreaks
  • isolate virus
  • public-health notes
  • antivirals
  • P3 lab

Sources for this job· O*NET 19-1022.00· ESCO/ISCO 2131

Analyse my job

Jobs with similar scores

  1. 526Neurosurgeon19%
  2. 527Power-plant operator19%
  3. 528Demolition worker19%
  4. 530Concrete finisher19%
  5. 531Piling operator19%
  6. 532Recycling-plant operator19%