Automation index
How much of a Watchmaker’s job can AI already do?
A diagnosis and a spare come earlier. Opening the movement so it keeps time again do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Watchmaker
22%
AI can already do 22% of this job.
#471 / 763
View rankingWatchmaker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnose, quote and explain to the client.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Open, strip, clean and oil the movement.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Spares, rate adjustment and calibration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cases, straps, water resistance and polish.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The counter, commissions and pieces that do not come back.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Times, real spares and a watch that keeps time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- repair watches
- open movements
- oil calibres
- adjust rate
- change straps
- water-resistance test
- diagnose watches
- polish cases
Sources for this job· O*NET 51-9071.00· ESCO/ISCO 7311
IS WORK OVER?
HVAC engineer
27%
#178 / 763
View rankingHVAC engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Loads, flows and the plant.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the duct and the one they crushed.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Commissioning, the balance and the room that sweats.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Noise, the grille and not leaving the whistle.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the saving and not killing the fresh air.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not sweat, and not oversizing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- load calcs
- air flows
- ducts
- balancing
- grilles
- fresh air
- whistles
- HVAC plant
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149