Automation index
How much of a Water technician’s job can AI already do?
A network test comes earlier. Potable water without bursting the main do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Water technician
22%
AI can already do 22% of this job.
#381 / 633
View rankingWater technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Network, test and the chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Leak, locate and the shut-off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Tank, the level and the one that runs dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notice, the neighbourhood and not leaving them dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The inspection, the figure and not dressing chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Potable, and the main whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- water network
- chlorine
- leaks
- tanks
- tests
- shut-offs
- neighbourhoods
- mains
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144