IS WORK OVER?

Automation index

How much of a Water technician’s job can AI already do?

A network test comes earlier. Potable water without bursting the main do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Water technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, test and the chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Leak, locate and the shut-off.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tank, the level and the one that runs dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notice, the neighbourhood and not leaving them dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The inspection, the figure and not dressing chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Potable, and the main whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • water network
  • chlorine
  • leaks
  • tanks
  • tests
  • shut-offs
  • neighbourhoods
  • mains

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

BIM modeller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model, families and clash detection.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
IFC, BEP and trade coordination.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Site, the one who will not open the model, and the meeting.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Quantities, parameters and the 4D nobody uses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The last-minute change and not breaking the federated model.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be built, and not over-modelling.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • BIM modelling
  • clash detection
  • Revit families
  • IFC
  • BEP
  • coordinate trades
  • BIM quantities
  • federated model

Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3118

Analyse my job

Jobs with similar scores

  1. 378Ticket inspector22%
  2. 379Cider maker22%
  3. 380Heat-pump technician22%
  4. 382Avionics technician22%
  5. 383Calibration technician22%
  6. 384PCB technician22%