Automation index
How much of a Water technician’s job can AI already do?
A network test comes earlier. Potable water without bursting the main do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Water technician
22%
AI can already do 22% of this job.
#467 / 753
View rankingWater technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Network, test and the chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Leak, locate and the shut-off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Tank, the level and the one that runs dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notice, the neighbourhood and not leaving them dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The inspection, the figure and not dressing chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Potable, and the main whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- water network
- chlorine
- leaks
- tanks
- tests
- shut-offs
- neighbourhoods
- mains
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132
IS WORK OVER?
Facilities engineer
22%
#392 / 753
View rankingFacilities engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
CMMS, tickets and the PPM.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Roof, the chiller and the one that will not start.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Generator, the diesel and not leaving it dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fire, the pump and the monthly test.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The tenant, August and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That cooling does not die, and not leaving the generator dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- CMMS
- PPM
- chillers
- generators
- diesel
- fire pumps
- roofs
- tickets
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149