IS WORK OVER?

Automation index

How much of a Water technician’s job can AI already do?

A network test comes earlier. Potable water without bursting the main do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Water technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, test and the chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Leak, locate and the shut-off.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tank, the level and the one that runs dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notice, the neighbourhood and not leaving them dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The inspection, the figure and not dressing chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Potable, and the main whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • water network
  • chlorine
  • leaks
  • tanks
  • tests
  • shut-offs
  • neighbourhoods
  • mains

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 449Cider maker22%
  2. 450Non-commissioned officer22%
  3. 451Heat-pump technician22%
  4. 453Avionics technician22%
  5. 454Calibration technician22%
  6. 455PCB technician22%