IS WORK OVER?

Automation index

How much of a Water technician’s job can AI already do?

A network test comes earlier. Potable water without bursting the main do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Water technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, test and the chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Leak, locate and the shut-off.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tank, the level and the one that runs dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notice, the neighbourhood and not leaving them dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The inspection, the figure and not dressing chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Potable, and the main whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • water network
  • chlorine
  • leaks
  • tanks
  • tests
  • shut-offs
  • neighbourhoods
  • mains

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Nuclear engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Neutronics, thermal-hydraulics and the file.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Control room, tests and the set-point.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Licence, the regulator and the safety analyses.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Outage, reload and spent fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The event, safety culture and the report.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Not playing with reactivity, and signing the analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%24%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • neutronics
  • thermal-hydraulics
  • nuclear licence
  • reload
  • safety analysis
  • control room
  • spent fuel
  • safety culture

Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 378Ticket inspector22%
  2. 379Cider maker22%
  3. 380Heat-pump technician22%
  4. 382Avionics technician22%
  5. 383Calibration technician22%
  6. 384PCB technician22%