IS WORK OVER?

Automation index

How much of a Water technician’s job can AI already do?

A network test comes earlier. Potable water without bursting the main do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Water technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, test and the chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Leak, locate and the shut-off.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tank, the level and the one that runs dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notice, the neighbourhood and not leaving them dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The inspection, the figure and not dressing chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Potable, and the main whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • water network
  • chlorine
  • leaks
  • tanks
  • tests
  • shut-offs
  • neighbourhoods
  • mains

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 449Cider maker22%
  2. 450Non-commissioned officer22%
  3. 451Heat-pump technician22%
  4. 453Avionics technician22%
  5. 454Calibration technician22%
  6. 455PCB technician22%