IS WORK OVER?

Automation index

How much of a Water technician’s job can AI already do?

A network test comes earlier. Potable water without bursting the main do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Water technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Network, test and the chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Leak, locate and the shut-off.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Tank, the level and the one that runs dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Notice, the neighbourhood and not leaving them dry.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The inspection, the figure and not dressing chlorine.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Potable, and the main whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • water network
  • chlorine
  • leaks
  • tanks
  • tests
  • shut-offs
  • neighbourhoods
  • mains

Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132

Tram driver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Checks, log and the cab.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drive, stops and the pedestrian who steps out.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Badly parked car, calls and Control.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Timetable, reliefs and rush hour.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The tourist, the bike and not over-hooting.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Hit nobody, and make the terminus.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drive trams
  • urban stops
  • pedestrians
  • badly parked cars
  • Control
  • rush hour
  • cab checks
  • terminus

Sources for this job· O*NET 53-4041.00· ESCO/ISCO 8311

Analyse my job

Jobs with similar scores

  1. 387Ticket inspector22%
  2. 388Cider maker22%
  3. 389Heat-pump technician22%
  4. 391Avionics technician22%
  5. 392Calibration technician22%
  6. 393PCB technician22%