Automation index
How much of a Water technician’s job can AI already do?
A network test comes earlier. Potable water without bursting the main do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Water technician
22%
AI can already do 22% of this job.
#390 / 643
View rankingWater technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Network, test and the chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Leak, locate and the shut-off.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Tank, the level and the one that runs dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Notice, the neighbourhood and not leaving them dry.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The inspection, the figure and not dressing chlorine.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Potable, and the main whole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- water network
- chlorine
- leaks
- tanks
- tests
- shut-offs
- neighbourhoods
- mains
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132
IS WORK OVER?
Wind-turbine technician
19%
#546 / 643
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412