Automation index
How much of a Waterproofer’s job can AI already do?
A junction detail comes earlier. No leak at the parapet joint do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waterproofer
21%
AI can already do 21% of this job.
#503 / 733
View rankingWaterproofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Substrate, fall and primer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Membrane, weld and the parapet junction.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Flood test and the leak that shows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Details, outlets and pipe penetrations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The roof, the wind and not flying a sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No leak, and not skimping the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- weld membranes
- parapet junctions
- flood test
- outlets
- primer
- pipe penetrations
- roof falls
- laps
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142