IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Flight dispatcher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Plan, NOTAM, METAR and the fuel.
Estimate

No public source provides a precise figure. This is our estimate.

18%52%+9.4
Slot, alternates and weight.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
The crew, the change and the late aircraft.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
MEL, restrictions and the go or no-go.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the diversion and recalculating in time.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Not leaving it short, and signing the release.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • flight plans
  • NOTAM
  • METAR
  • fuel calc
  • slots
  • MEL
  • alternates
  • operational release

Sources for this job· O*NET 53-2022.00· ESCO/ISCO 3154

Analyse my job

Jobs with similar scores

  1. 430Gynaecologist21%
  2. 431Executive housekeeper21%
  3. 432Illustrator21%
  4. 434Solar installer21%
  5. 435Train conductor21%
  6. 436Marine engineer21%