Automation index
How much of a Waterproofer’s job can AI already do?
A junction detail comes earlier. No leak at the parapet joint do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waterproofer
21%
AI can already do 21% of this job.
#519 / 753
View rankingWaterproofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Substrate, fall and primer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Membrane, weld and the parapet junction.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Flood test and the leak that shows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Details, outlets and pipe penetrations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The roof, the wind and not flying a sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No leak, and not skimping the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- weld membranes
- parapet junctions
- flood test
- outlets
- primer
- pipe penetrations
- roof falls
- laps
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145