IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 500Gynaecologist21%
  2. 501Executive housekeeper21%
  3. 502Illustrator21%
  4. 504Solar installer21%
  5. 505Train conductor21%
  6. 506Marine engineer21%