IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 509Gynaecologist21%
  2. 510Executive housekeeper21%
  3. 511Illustrator21%
  4. 513Solar installer21%
  5. 514Train conductor21%
  6. 515Marine engineer21%