IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Scaffolder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drawings, notes and kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Erect, plumb and tie in.
Estimate

No public source provides a precise figure. This is our estimate.

24%8%+1.9
Heights, harness and weather.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site, trades and striking.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Logs, quantities and extras.
Estimate

No public source provides a precise figure. This is our estimate.

14%22%+3.1
Not leaving a loose scaffold.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%16%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, notes and kit
  • Erect, plumb and tie in
  • Heights, harness and weather
  • Site, trades and striking
  • Logs, quantities and extras
  • Not leaving a loose scaffold
  • montador de andamios
  • andamista
  • scaffolder

Sources for this job· O*NET 47-2031.00· ESCO/ISCO 7119

Analyse my job

Jobs with similar scores

  1. 421Gynaecologist21%
  2. 422Executive housekeeper21%
  3. 423Illustrator21%
  4. 425Solar installer21%
  5. 426Train conductor21%
  6. 427Marine engineer21%