IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Small-hydro technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Flow, set-point and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Turbine, the bearing and the one that sounds.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Gate, the jam and the log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Low flow, the river and not forcing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The flood, the spill and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That it spins, and not dry.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • turbinable flow
  • bearings
  • gates
  • low flow
  • spills
  • small hydro
  • turbine logs
  • jams

Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131

Analyse my job

Jobs with similar scores

  1. 430Gynaecologist21%
  2. 431Executive housekeeper21%
  3. 432Illustrator21%
  4. 434Solar installer21%
  5. 435Train conductor21%
  6. 436Marine engineer21%