IS WORK OVER?

Automation index

How much of a Waterproofer’s job can AI already do?

A junction detail comes earlier. No leak at the parapet joint do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Waterproofer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Substrate, fall and primer.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Membrane, weld and the parapet junction.
Estimate

No public source provides a precise figure. This is our estimate.

18%12%+2.2
Flood test and the leak that shows.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Details, outlets and pipe penetrations.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
The roof, the wind and not flying a sheet.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
No leak, and not skimping the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • weld membranes
  • parapet junctions
  • flood test
  • outlets
  • primer
  • pipe penetrations
  • roof falls
  • laps

Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121

Storyboard artist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Script, shots and the rhythm.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Draw, arrows and the one that does not read.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Review, the director and the scene change.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Delivery, numbering and the missing one.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The budget, the impossible and not drawing a shoot that will not fit.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it can be shot, and that it reads.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • shots
  • camera arrows
  • rhythm
  • shooting script
  • numbering
  • review with direction
  • scenes
  • board delivery

Sources for this job· O*NET 27-1014.00· ESCO/ISCO 2166

Analyse my job

Jobs with similar scores

  1. 421Gynaecologist21%
  2. 422Executive housekeeper21%
  3. 423Illustrator21%
  4. 425Solar installer21%
  5. 426Train conductor21%
  6. 427Marine engineer21%