Automation index
How much of a Waterproofer’s job can AI already do?
A junction detail comes earlier. No leak at the parapet joint do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waterproofer
21%
AI can already do 21% of this job.
#424 / 633
View rankingWaterproofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Substrate, fall and primer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Membrane, weld and the parapet junction.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Flood test and the leak that shows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Details, outlets and pipe penetrations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The roof, the wind and not flying a sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No leak, and not skimping the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- weld membranes
- parapet junctions
- flood test
- outlets
- primer
- pipe penetrations
- roof falls
- laps
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121
IS WORK OVER?
Wastewater-plant operator
19%
#519 / 633
View rankingWastewater-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Flow, process and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Basin, the sludge and the one that goes.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Breakdown, the pump and at night.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Test, the discharge and not hiding the spike.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The rain, the overflow and not opening extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come out clean, and the sludge in place.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- works flow
- sludge
- basins
- pumps
- discharges
- overflows
- plant logs
- final tests
Sources for this job· O*NET 51-8031.00· ESCO/ISCO 3132