Automation index
How much of a Waterproofer’s job can AI already do?
A junction detail comes earlier. No leak at the parapet joint do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Waterproofer
21%
AI can already do 21% of this job.
#438 / 653
View rankingWaterproofer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Substrate, fall and primer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Membrane, weld and the parapet junction.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 12% | +2.2 |
Flood test and the leak that shows.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Details, outlets and pipe penetrations.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
The roof, the wind and not flying a sheet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
No leak, and not skimping the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- weld membranes
- parapet junctions
- flood test
- outlets
- primer
- pipe penetrations
- roof falls
- laps
Sources for this job· O*NET 47-2181.00· ESCO/ISCO 7121
IS WORK OVER?
Welding inspector
22%
#351 / 653
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119