Automation index
How much of a Wealth manager’s job can AI already do?
A model book comes earlier. Sitting with the client without selling them the house product do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wealth manager
27%
AI can already do 27% of this job.
#156 / 623
View rankingWealth manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Profile, IPS and the book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Meeting, the fear and the one who wants it all on deposit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Tax, succession and not leaving a hole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the market and not dressing the year.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The committee, the product and not pushing the house book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sit for real, and not selling the house product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IPS
- wealth books
- succession
- wealth tax
- risk profiles
- client reports
- house products
- deposits
Sources for this job· O*NET 13-2052.00· ESCO/ISCO 2412
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142