Automation index
How much of a Wealth manager’s job can AI already do?
A model book comes earlier. Sitting with the client without selling them the house product do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wealth manager
27%
AI can already do 27% of this job.
#156 / 633
View rankingWealth manager
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Profile, IPS and the book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Meeting, the fear and the one who wants it all on deposit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Tax, succession and not leaving a hole.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Report, the market and not dressing the year.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The committee, the product and not pushing the house book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Sit for real, and not selling the house product.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- IPS
- wealth books
- succession
- wealth tax
- risk profiles
- client reports
- house products
- deposits
Sources for this job· O*NET 13-2052.00· ESCO/ISCO 2412
IS WORK OVER?
Wind-turbine technician
19%
#536 / 633
View rankingWind-turbine technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
SCADA, the code and the spare.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Climb, the wind and the one who is sick.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Nacelle, the oil and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Rescue, the protocol and not improvising.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The storm, the access and aborting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Come down whole, and the turbine running.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- farm SCADA
- climb the tower
- nacelle
- height rescue
- oils
- fault codes
- access
- wind
Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412