IS WORK OVER?

Automation index

How much of a Weaver’s job can AI already do?

A weave comes earlier. Warping, weaving without breaking the pick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

Camera operator

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Schedule, lists and overlays.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Frame, follow and not lose focus.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Kit, cards and backups.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Director, light and sound.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Knees, shoulder and long days.
Estimate

No public source provides a precise figure. This is our estimate.

16%16%+2.6
Not wiping a full card.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Schedule, lists and overlays
  • Frame, follow and not lose focus
  • Kit, cards and backups
  • Director, light and sound
  • Knees, shoulder and long days
  • Not wiping a full card
  • camara
  • operador de camara
  • camera operator

Sources for this job· O*NET 27-4031.00· ESCO/ISCO 3521

Analyse my job

Jobs with similar scores

  1. 539Hydrogen technician19%
  2. 540Small-hydro technician19%
  3. 541Surgical technologist19%
  4. 543Occupational therapist19%
  5. 544Tractor driver19%
  6. 545Stagehand19%