IS WORK OVER?

Automation index

How much of a Weaver’s job can AI already do?

A weave comes earlier. Warping, weaving without breaking the pick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

Civil engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Structural calcs and code checks.
Estimate

No public source provides a precise figure. This is our estimate.

22%42%+9.2
Drawings, quantities and cost estimate.
Estimate

No public source provides a precise figure. This is our estimate.

18%38%+6.8
Geotech and simplified impact reports.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordination with contractor, council and suppliers.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Site execution and safety control.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Site authority and responsible signature.
Estimate

No public source provides a precise figure. This is our estimate.

12%10%+1.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Structural calcs and code checks
  • Drawings, quantities and cost estimate
  • Geotech and simplified impact reports
  • Site execution and safety control
  • Site authority and responsible signature
  • ingeniero civil
  • civil engineer
  • obras publicas
  • caminos

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 539Hydrogen technician19%
  2. 540Small-hydro technician19%
  3. 541Surgical technologist19%
  4. 543Occupational therapist19%
  5. 544Tractor driver19%
  6. 545Stagehand19%