Automation index
How much of a Weaver’s job can AI already do?
A weave comes earlier. Warping, weaving without breaking the pick do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Weaver
19%
AI can already do 19% of this job.
#542 / 633
View rankingWeaver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Warp, weave and the width.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Weave, shuttle and the yarn that snaps.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Finish, fringe and the shrink.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Loom, the rhythm and the commissioned piece.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The client, the colour and not changing the warp halfway.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Without breaking the pick, and a clean weave.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- warp
- weaves
- shuttle
- looms
- fringe
- the pick
- cloth width
- shrink
Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318
IS WORK OVER?
Civil engineer
25%
#231 / 633
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142