IS WORK OVER?

Automation index

How much of a Weaver’s job can AI already do?

A weave comes earlier. Warping, weaving without breaking the pick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

HVAC engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Loads, flows and the plant.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the duct and the one they crushed.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Commissioning, the balance and the room that sweats.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Noise, the grille and not leaving the whistle.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the saving and not killing the fresh air.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not sweat, and not oversizing.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • load calcs
  • air flows
  • ducts
  • balancing
  • grilles
  • fresh air
  • whistles
  • HVAC plant

Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149

Analyse my job

Jobs with similar scores

  1. 668Surgical technologist19%
  2. 669IVF laboratory technician19%
  3. 670Substation technician19%
  4. 672Occupational therapist19%
  5. 673Tractor driver19%
  6. 674Stagehand19%