IS WORK OVER?

Automation index

How much of a Weaver’s job can AI already do?

A weave comes earlier. Warping, weaving without breaking the pick do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Weaver

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Warp, weave and the width.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Weave, shuttle and the yarn that snaps.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Finish, fringe and the shrink.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Loom, the rhythm and the commissioned piece.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The client, the colour and not changing the warp halfway.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Without breaking the pick, and a clean weave.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • warp
  • weaves
  • shuttle
  • looms
  • fringe
  • the pick
  • cloth width
  • shrink

Sources for this job· O*NET 51-6062.00· ESCO/ISCO 7318

Wind-turbine technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
SCADA, the code and the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Climb, the wind and the one who is sick.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Nacelle, the oil and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Rescue, the protocol and not improvising.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The storm, the access and aborting.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Come down whole, and the turbine running.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • farm SCADA
  • climb the tower
  • nacelle
  • height rescue
  • oils
  • fault codes
  • access
  • wind

Sources for this job· O*NET 49-9081.00· ESCO/ISCO 7412

Analyse my job

Jobs with similar scores

  1. 549Hydrogen technician19%
  2. 550Small-hydro technician19%
  3. 551Surgical technologist19%
  4. 553Occupational therapist19%
  5. 554Tractor driver19%
  6. 555Stagehand19%