Automation index
How much of a Web developer’s job can AI already do?
A layout and a component come earlier. A site that loads and does not die on a Friday does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Web developer
26%
AI can already do 26% of this job.
#198 / 623
View rankingWeb developer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Layout, components and API consumption.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 48% | +9.6 |
Accessibility, performance and technical SEO.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Design, product and the client who changes their mind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Deploys, incidents and monitoring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Tests, code review and documentation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not shipping a half-change on a Friday.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- write code
- programming
- software development
- coding
- debug code
- Layout, components and API consumption
- Deploys, incidents and monitoring
- Tests, code review and documentation
- Not shipping a half-change on a Friday
- desarrollador web
Sources for this job· O*NET 15-1254.00· ESCO/ISCO 2513
IS WORK OVER?
Nuclear engineer
24%
#267 / 623
View rankingNuclear engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Neutronics, thermal-hydraulics and the file.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Control room, tests and the set-point.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Licence, the regulator and the safety analyses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Outage, reload and spent fuel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
The event, safety culture and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Not playing with reactivity, and signing the analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- neutronics
- thermal-hydraulics
- nuclear licence
- reload
- safety analysis
- control room
- spent fuel
- safety culture
Sources for this job· O*NET 17-2161.00· ESCO/ISCO 2149