Automation index
How much of a Welder’s job can AI already do?
Today an AI or a robot can hardly do this job for you. The site, the surprises, and the code are settled on the ground.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welder
28%
AI can already do 28% of this job.
#119 / 623
View rankingWelder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Operate safety equipment and use safe work habits.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 28% | +1.7 |
Melt and apply solder along adjoining edges of workpieces to solder joints, using soldering irons, gas torches, or electric-ultrasonic equipment.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Weld components in flat, vertical, or overhead positions.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Check grooves, angles, or gap allowances, using micrometers, calipers, and precision measuring instruments.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Determine required equipment and welding methods, applying knowledge of metallurgy, geometry, and welding techniques.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Align and clamp workpieces together, using rules, squares, or hand tools, or position items in fixtures, jigs, or vises.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Select and install torches, torch tips, filler rods, and flux, according to welding chart specifications or types and thicknesses of metals.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 28% | +1.4 |
Recognize, set up, and operate hand and power tools common to the welding trade, such as shielded metal arc and gas metal arc welding equipment.EstimateNo public source provides a precise figure. This is our estimate. | 4% | 28% | +1.1 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 60% | 28% | +16.8 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- technical drawings
- hydraulics
- pipeline coating properties
- types of pipelines
- isometric perspective
- cooperate with colleagues
- inspect pipelines
- use welding equipment
- operate welding equipment
- clear pipelines
Sources for this job· O*NET 51-4121.00· ESCO/ISCO 7212
IS WORK OVER?
Building surveyor
22%
#321 / 623
View rankingBuilding surveyor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Quantities, valuations and cost control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Working drawings and trade coordination.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, visits and safety.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Client, contractor and site team.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Quality, tests and the building book.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign a build that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Quantities, valuations and cost control
- Working drawings and trade coordination
- Site, visits and safety
- Client, contractor and site team
- Quality, tests and the building book
- Sign a build that will not fall
- arquitecto tecnico
Sources for this job· O*NET 17-3011.00· ESCO/ISCO 3112