IS WORK OVER?

Automation index

How much of a Welding engineer’s job can AI already do?

A WPS comes earlier. The bead holding without signing an extra overlap do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, the coupon and the qualification.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shop, the bead and the one who skips the procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the fail and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the position and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing the extra overlap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the bead holds, and not signing the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • coupons
  • welder qualification
  • beads
  • NDT
  • positions
  • overlaps
  • welding procedures

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Cost engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Measure, rates and the budget.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Works, the variance and the one that was not logged.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Change, the extra and not giving it away.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Close, the dispute and not inflating.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Management, the bid and not selling the reckless one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
The real number, and not the reckless bid.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • measures
  • unit rates
  • variances
  • extras
  • disputes
  • reckless bids
  • works budgets
  • closes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 391Bridge engineer22%
  2. 392Commissioning engineer22%
  3. 393Safety engineer22%
  4. 395Power engineer22%
  5. 396Railway engineer22%
  6. 397Forestry engineer22%