IS WORK OVER?

Automation index

How much of a Welding engineer’s job can AI already do?

A WPS comes earlier. The bead holding without signing an extra overlap do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, the coupon and the qualification.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shop, the bead and the one who skips the procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the fail and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the position and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing the extra overlap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the bead holds, and not signing the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • coupons
  • welder qualification
  • beads
  • NDT
  • positions
  • overlaps
  • welding procedures

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

Firmware engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Image, the signature and the slot.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Flash, the batch and the one that bricks.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Rollback, the test and not skipping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Boot, the brick and the one that will not start.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The factory, the cadence and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Flash without bricking, and not skipping rollback.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • firmware images
  • digital signature
  • slots
  • flash
  • rollback
  • boot
  • factory batches
  • not brick

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 406Gas network engineer22%
  2. 407District heating engineer22%
  3. 408Safety engineer22%
  4. 410Tunnel engineer22%
  5. 411Power engineer22%
  6. 412Geomatics engineer22%