Automation index
How much of a Welding engineer’s job can AI already do?
A WPS comes earlier. The bead holding without signing an extra overlap do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding engineer
22%
AI can already do 22% of this job.
#400 / 753
View rankingWelding engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, the coupon and the qualification.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Shop, the bead and the one who skips the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the fail and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the position and the wind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The client, the rush and not signing the extra overlap.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the bead holds, and not signing the overlap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- coupons
- welder qualification
- beads
- NDT
- positions
- overlaps
- welding procedures
Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144
IS WORK OVER?
Lighting engineer
27%
#178 / 753
View rankingLighting engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calc, Dialux and the standard.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Works, the point and the one that was not put in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Night, the glare and the pedestrian.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Saving, the LED and not leaving the crossing dark.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The council, the complaint and not dressing the lux.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That you can see, and not glaring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Dialux
- lux
- glare
- lighting points
- LED
- crossings
- lighting standards
- calcs
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149