IS WORK OVER?

Automation index

How much of a Welding engineer’s job can AI already do?

A WPS comes earlier. The bead holding without signing an extra overlap do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, the coupon and the qualification.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Shop, the bead and the one who skips the procedure.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the fail and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the position and the wind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the rush and not signing the extra overlap.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the bead holds, and not signing the overlap.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • coupons
  • welder qualification
  • beads
  • NDT
  • positions
  • overlaps
  • welding procedures

Sources for this job· O*NET 17-2141.00· ESCO/ISCO 2144

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 391Bridge engineer22%
  2. 392Commissioning engineer22%
  3. 393Safety engineer22%
  4. 395Power engineer22%
  5. 396Railway engineer22%
  6. 397Forestry engineer22%