IS WORK OVER?

Automation index

How much of a Welding inspector’s job can AI already do?

A WPS comes earlier. Accepting the bead without signing the pore do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Art teacher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Project, the sheet and the kit.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Classroom, the one who will not dare and the one who bins it.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Technique, the mistake and not doing it for them.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Show, the corridor and not hanging only the pretty.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Staff, 'it's a soft subject', and not dropping the bar.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they get dirty, and not copying the model.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • art sheets
  • art projects
  • technique
  • school shows
  • classroom kit
  • not do it for them
  • the bar
  • getting dirty

Sources for this job· O*NET 25-2031.00· ESCO/ISCO 2330

Analyse my job

Jobs with similar scores

  1. 354Agronomist22%
  2. 355Mining engineer22%
  3. 356Forestry engineer22%
  4. 358EV charger installer22%
  5. 359Social integrator22%
  6. 360Banquet manager22%