Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#392 / 733
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Bridge engineer
22%
#386 / 733
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142