Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#406 / 753
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165