IS WORK OVER?

Automation index

How much of a Welding inspector’s job can AI already do?

A WPS comes earlier. Accepting the bead without signing the pore do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Harbour pilot

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Chart, draught and the manoeuvre plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Board, conning and the tug.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Wind, current and coming alongside.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Pilotage, the master and not fighting the bridge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fog, the closure and the yes or no to enter.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Get it in whole, and not scraping the bottom.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%20%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • pilotage
  • conning
  • draughts
  • tugs
  • come alongside
  • charts
  • beam wind
  • the basin

Sources for this job· O*NET 53-5021.00· ESCO/ISCO 3152

Analyse my job

Jobs with similar scores

  1. 346Agronomist22%
  2. 347Mining engineer22%
  3. 348Forestry engineer22%
  4. 350EV charger installer22%
  5. 351Social integrator22%
  6. 352Banquet manager22%