IS WORK OVER?

Automation index

How much of a Welding inspector’s job can AI already do?

A WPS comes earlier. Accepting the bead without signing the pore do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Petroleum engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Reservoir, rate and the well programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Rig, mud and lost circulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Completion, tests and the ops report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Production, water cut and the workover.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
HSE, blowout and the drill that is not a game.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not killing the well, and signing the programme.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • model reservoirs
  • well programmes
  • drilling mud
  • completion
  • workover
  • water cut
  • well HSE
  • production tests

Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 346Agronomist22%
  2. 347Mining engineer22%
  3. 348Forestry engineer22%
  4. 350EV charger installer22%
  5. 351Social integrator22%
  6. 352Banquet manager22%