IS WORK OVER?

Automation index

How much of a Welding inspector’s job can AI already do?

A WPS comes earlier. Accepting the bead without signing the pore do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 396Railway engineer22%
  2. 397Forestry engineer22%
  3. 398Geotechnical engineer22%
  4. 400EV charger installer22%
  5. 401Social integrator22%
  6. 402Heritage interpreter22%