Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#426 / 773
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
QA automation engineer
27%
#192 / 773
View rankingQA automation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Test, the selector and the flake.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pipeline, the green and the one that lies.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bug, the repro and not closing it blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Data, the environment and not sharing prod.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The developer, the rush and not skipping the one that fails.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Catch the bug, and not painting a lying green.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- automated tests
- selectors
- flakes
- QA pipelines
- repro
- environments
- lying green
- debug tests
Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519