IS WORK OVER?

Automation index

How much of a Welding inspector’s job can AI already do?

A WPS comes earlier. Accepting the bead without signing the pore do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Welding inspector

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
WPS, qualification and the bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Visual, the pore and the one that hides.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
NDT, the report and not contradicting.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Site, the access and the welder who rushes.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The deadline, the pressure and not signing the pore.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Accept the sound bead.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • WPS
  • beads
  • pores
  • welder qualification
  • weld NDT
  • site
  • access
  • inspection reports

Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119

Railway engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Track, geometry and the study.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Points, the blade and the one that will not close.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
OLE, the height and the gauge.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the possession and not leaving the wire wrong.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The operator, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it does not derail, and not signing half-done points.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • track geometry
  • points
  • OLE
  • gauge
  • possessions
  • blades
  • railway studies
  • not jump to a yes

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 389Railway engineer22%
  2. 390Forestry engineer22%
  3. 391Geotechnical engineer22%
  4. 393EV charger installer22%
  5. 394Social integrator22%
  6. 395Heritage interpreter22%