Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#349 / 643
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Soldier
14%
#638 / 643
View rankingSoldier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, written orders and paper logistics.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Classroom drill and simulators.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Physical drill, weapons and field.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Operations, watch and deployment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 8% | +1.4 |
Unit life, discipline and comrades.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Command or be commanded in a real incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, written orders and paper logistics
- Classroom drill and simulators
- Physical drill, weapons and field
- Operations, watch and deployment
- Unit life, discipline and comrades
- Command or be commanded in a real incident
- militar
- soldado
- soldier
- ejercito
Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110