Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#349 / 643
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Stagehand
19%
#555 / 643
View rankingStagehand
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Plot, marks and the weight.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Change, blackout and the one who is late.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Loads, pulleys and the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Technical rehearsal and the one who walks the light.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The show, the surprise and not improvising loads.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Take nobody down, and the change on time.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- blackout changes
- stage marks
- pulleys
- loads
- technical rehearsal
- sets
- the show
- weights
Sources for this job· O*NET 27-2099.00· ESCO/ISCO 3435