Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#349 / 643
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Tow-truck driver
20%
#453 / 643
View rankingTow-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Call, route and the vehicle type.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Hard shoulder, hook and traffic that will not stop.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Hydraulics, bed and the low car that scrapes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Garage, the note and the client who argues.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Night, rain and not becoming the next crash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not making the crash worse, and signing the hook.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 20% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- hook vehicles
- hard shoulder
- the bed
- recovery calls
- crane hydraulics
- recovery notes
- traffic
- low cars
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332