Automation index
How much of a Welding inspector’s job can AI already do?
A WPS comes earlier. Accepting the bead without signing the pore do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Welding inspector
22%
AI can already do 22% of this job.
#349 / 643
View rankingWelding inspector
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
WPS, qualification and the bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Visual, the pore and the one that hides.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
NDT, the report and not contradicting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Site, the access and the welder who rushes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The deadline, the pressure and not signing the pore.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Accept the sound bead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- WPS
- beads
- pores
- welder qualification
- weld NDT
- site
- access
- inspection reports
Sources for this job· O*NET 51-9061.00· ESCO/ISCO 3119
IS WORK OVER?
Treasurer
27%
#194 / 643
View rankingTreasurer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cash, forecast and the maturities.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Banks, facilities and the one that does not land.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Payments, the supplier and the one that waits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Board, the report and not dressing cash.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The crunch, confirming and not hiding the hole.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Liquidity on Friday, and not lying to the bank.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cash forecast
- maturities
- facilities
- supplier payments
- confirming
- liquidity
- banks
- board report
Sources for this job· O*NET 11-3031.00· ESCO/ISCO 1211