Automation index
How much of a Well driller’s job can AI already do?
A progress log comes earlier. Clean water without collapsing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Well driller
19%
AI can already do 19% of this job.
#534 / 633
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113
IS WORK OVER?
Architect
28%
#81 / 633
View rankingArchitect
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Draft plans, sections and a first BIM model from the brief.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Produce renders, views and façade options.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Write quantities, specs and the project report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Meetings with client, developer and planning office.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Site direction and inspection visits.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Stamp, register and own legal responsibility.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 8% | +1 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- building plans
- renders
- sign a project
- Produce renders, views and façade options
- Site direction and inspection visits
- arquitect
- architect
- proyecto de edificio
Sources for this job· O*NET 17-1011.00· ESCO/ISCO 2161