IS WORK OVER?

Automation index

How much of a Well driller’s job can AI already do?

A progress log comes earlier. Clean water without collapsing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Corrosion engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Thicknesses, the map and the coupon.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Plant, the pipe and the one that is thin.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Cathode, the protection and the one that will not take.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Shutdown, the coating and not painting over rust.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Operations, the rush and not leaving the thin one in service.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Stop before it goes, and not painting over it.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • thicknesses
  • corrosion maps
  • cathodic protection
  • coatings
  • thin pipes
  • shutdowns
  • rust
  • coupons

Sources for this job· O*NET 17-2131.00· ESCO/ISCO 2145

Analyse my job

Jobs with similar scores

  1. 642Furniture restorer19%
  2. 643Tailor19%
  3. 644Milliner19%
  4. 646Woodcarver19%
  5. 647Aerospace technician19%
  6. 648Wind-turbine technician19%