IS WORK OVER?

Automation index

How much of a Well driller’s job can AI already do?

A progress log comes earlier. Clean water without collapsing the well do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Well driller

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Location, permit and the progress log.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Drill, case and the collapse.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Mud, samples and the geological log.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Yield test, pump and the water analysis.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The owner, the neighbour and the well that will not yield.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Clean water, and not leaving a blind well.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill wells
  • case
  • yield test
  • drilling mud
  • geological log
  • samples
  • well pumps
  • drilling permits

Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113

Shelf replenisher

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Wave, location and the cage.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Shelf, date and the one at the back.
Estimate

No public source provides a precise figure. This is our estimate.

22%10%+2.2
Aisle, the customer and not blocking.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Out of stock, calling it and the gap.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The peak, overtime and not mixing batches.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Shelf full, and aisle clear.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%21%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • waves
  • the shelf
  • dates
  • aisles
  • stock-outs
  • cages
  • batches
  • gaps

Sources for this job· O*NET 43-5081.00· ESCO/ISCO 9334

Analyse my job

Jobs with similar scores

  1. 541Furniture restorer19%
  2. 542Tailor19%
  3. 543Milliner19%
  4. 545Woodcarver19%
  5. 546Wind-turbine technician19%
  6. 547Battery technician19%