Automation index
How much of a Well driller’s job can AI already do?
A progress log comes earlier. Clean water without collapsing the well do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Well driller
19%
AI can already do 19% of this job.
#645 / 753
View rankingWell driller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Location, permit and the progress log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drill, case and the collapse.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Mud, samples and the geological log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Yield test, pump and the water analysis.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the neighbour and the well that will not yield.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Clean water, and not leaving a blind well.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill wells
- case
- yield test
- drilling mud
- geological log
- samples
- well pumps
- drilling permits
Sources for this job· O*NET 47-5023.00· ESCO/ISCO 8113
IS WORK OVER?
Site engineer
19%
#606 / 753
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142