Automation index
How much of a Wildland firefighter’s job can AI already do?
A fire-front map comes earlier. Going onto the slope with the wind against you do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Wildland firefighter
18%
AI can already do 18% of this job.
#564 / 643
View rankingWildland firefighter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, map and the day’s attack plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Line, hose-lay and the spot fire.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 6% | +1.4 |
Tools, pump and the water that does not arrive.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Night watch, lookout and the flare-up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordinate aircraft and the command post.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 28% | +3.9 |
Get out whole and leave nobody behind.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 10% | +1.4 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- fight wildfires
- cut line
- lay hose
- night watch
- portable pump
- air assets
- fire-front map
- spot fires
Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411
IS WORK OVER?
Civil engineer
25%
#236 / 643
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142