IS WORK OVER?

Automation index

How much of a Wildland firefighter’s job can AI already do?

A fire-front map comes earlier. Going onto the slope with the wind against you do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Wildland firefighter

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Logs, map and the day’s attack plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Line, hose-lay and the spot fire.
Estimate

No public source provides a precise figure. This is our estimate.

24%6%+1.4
Tools, pump and the water that does not arrive.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Night watch, lookout and the flare-up.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Coordinate aircraft and the command post.
Estimate

No public source provides a precise figure. This is our estimate.

14%28%+3.9
Get out whole and leave nobody behind.
Estimate

No public source provides a precise figure. This is our estimate.

14%10%+1.4
Total100%18%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • fight wildfires
  • cut line
  • lay hose
  • night watch
  • portable pump
  • air assets
  • fire-front map
  • spot fires

Sources for this job· O*NET 33-2022.00· ESCO/ISCO 5411

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 561Forest ranger18%
  2. 562Aerial technician18%
  3. 563Varnisher18%
  4. 565Commercial diver18%
  5. 566Camera operator18%
  6. 567Bartender18%